Four steps from
measurement to shipment.
No design locks, no multi-round reviews, no project-management retainers. Pick a tier from the price book, confirm your drawings, pay 50%, and the factory does the rest.
Four confirmed steps. No surprises.
Every step has a published price, a defined input and a defined output.
Choose & Measure
- Product type and approximate size
- Measurements, drawings or photos
- Material tier from the price list
- Scope check against published pricing rules
- Add-on and freight direction
- Planning quote within 24 hours
- Planning quote with tier and add-ons priced
Confirm & Pay 50%
- Confirmed drawings, materials and hardware
- 50% deposit
- Drawing confirmation against production specs
- Material and hardware schedule
- Order confirmation with production schedule
Production · 15–16 Days
- Nothing — production runs to the confirmed drawings
- ERP panel scan & parts verification
- Human QC: doors, drawers, hardware, codes
- Export-ready packing
- QC photo records and packing list
Balance & Ship
- Final balance before dispatch
- Freight: LCL or FCL (forwarder contacts provided)
- Shipment and export documentation
- Delivery handover to your destination
- Cabinets at your door or port — your local trades install
Paperwork that protects your order.
Every order ships with records your installer and your accountant can both use.
Quotation & PI
Firm quote with tier, add-ons and freight written in.
Material & hardware sheet
Board, edge banding, hardware schedule per room.
QC photo records
Pre-assembly checks: alignment, drawer operation, hardware fit.
Packing list
Cabinet codes and room labels for your installer.
Shipping documents
Export paperwork for your broker or freight forwarder.
Three ways to get your cabinets.
Freight is quoted with your order — never hidden in the cabinet price.
LCL (Shared Container)
Single rooms and small orders. Pay for your share of a container, not a whole one.
FCL (Full Container)
Whole homes and batch orders. Best cost per cabinet at volume.
Freight Coordination
We connect you with freight forwarders; you arrange shipping. Export documents provided; duties and taxes are yours.
Before you order.
The three questions everyone asks about the factory-direct model.
What if I don’t have drawings?
Send measurements and photos — our design team prepares measured layouts and production drawings free of charge with your order.
Do you install the cabinets?
No. Installation is handled by your local trades, which is exactly why the price stays low. Your installer works from our cabinet codes, packing list and QC records.
How long until my cabinets arrive?
Production takes 15–16 days ex-factory. Shipping adds time depending on your destination and freight method — we confirm the estimate with your quote.
Your measurements. Our factory. 15–16 days.
Cabinets from RM 320/m², 50% deposit, balance before dispatch. The rest is on the price list.