How to Order

Four steps from
measurement to shipment.

No design locks, no multi-round reviews, no project-management retainers. Pick a tier from the price book, confirm your drawings, pay 50%, and the factory does the rest.

The Process

Four confirmed steps. No surprises.

Every step has a published price, a defined input and a defined output.

01

Choose & Measure

You provide
  • Product type and approximate size
  • Measurements, drawings or photos
  • Material tier from the price list
We do
  • Scope check against published pricing rules
  • Add-on and freight direction
  • Planning quote within 24 hours
You receive
  • Planning quote with tier and add-ons priced
02

Confirm & Pay 50%

You provide
  • Confirmed drawings, materials and hardware
  • 50% deposit
We do
  • Drawing confirmation against production specs
  • Material and hardware schedule
You receive
  • Order confirmation with production schedule
03

Production · 15–16 Days

You provide
  • Nothing — production runs to the confirmed drawings
We do
  • ERP panel scan & parts verification
  • Human QC: doors, drawers, hardware, codes
  • Export-ready packing
You receive
  • QC photo records and packing list
04

Balance & Ship

You provide
  • Final balance before dispatch
  • Freight: LCL or FCL (forwarder contacts provided)
We do
  • Shipment and export documentation
  • Delivery handover to your destination
You receive
  • Cabinets at your door or port — your local trades install
What You Receive

Paperwork that protects your order.

Every order ships with records your installer and your accountant can both use.

Quotation & PI

Firm quote with tier, add-ons and freight written in.

Material & hardware sheet

Board, edge banding, hardware schedule per room.

QC photo records

Pre-assembly checks: alignment, drawer operation, hardware fit.

Packing list

Cabinet codes and room labels for your installer.

Shipping documents

Export paperwork for your broker or freight forwarder.

Shipping & Delivery

Three ways to get your cabinets.

Freight is quoted with your order — never hidden in the cabinet price.

LCL (Shared Container)

Single rooms and small orders. Pay for your share of a container, not a whole one.

FCL (Full Container)

Whole homes and batch orders. Best cost per cabinet at volume.

Freight Coordination

We connect you with freight forwarders; you arrange shipping. Export documents provided; duties and taxes are yours.

Common Questions

Before you order.

The three questions everyone asks about the factory-direct model.

What if I don’t have drawings?

Send measurements and photos — our design team prepares measured layouts and production drawings free of charge with your order.

Do you install the cabinets?

No. Installation is handled by your local trades, which is exactly why the price stays low. Your installer works from our cabinet codes, packing list and QC records.

How long until my cabinets arrive?

Production takes 15–16 days ex-factory. Shipping adds time depending on your destination and freight method — we confirm the estimate with your quote.

Your measurements. Our factory. 15–16 days.

Cabinets from RM 320/m², 50% deposit, balance before dispatch. The rest is on the price list.

WhatsAppGet Price